“…Besides, more and more expansion alternatives, such as VRs and capacitor banks, are incorporated into the multistage DNP to mitigate the voltage deviation problem [9]. On the other hand, the operation cost includes the maintenance cost, energy loss, operation cost of substations [2], DG curtailment cost and loadshedding cost [3], costs of electricity procurement from the upstream power system and DGs [4], and reliability cost [10]. It should be mentioned that the reliability assessment is typically considered in the operation stage in some existing publications.…”