1995
DOI: 10.1080/00401706.1995.10485888
|View full text |Cite
|
Sign up to set email alerts
|

Multivariate SPC Charts for Monitoring Batch Processes

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

6
813
0
11

Year Published

1999
1999
2011
2011

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 1,155 publications
(830 citation statements)
references
References 40 publications
6
813
0
11
Order By: Relevance
“…In industrial applications, this can often be reasonably well achieved by taking observations sufficiently far apart in time. For syndromic surveillance data that exhibit characteristics such as seasonal cycles or other trends, which we were frankly surprised not to find in our data, other methods such as the EWMA or those proposed by Nomikos and MacGregor [NM95] might be more appropriate and effective.…”
Section: Applying Spc To Syndromic Surveillancementioning
confidence: 97%
“…In industrial applications, this can often be reasonably well achieved by taking observations sufficiently far apart in time. For syndromic surveillance data that exhibit characteristics such as seasonal cycles or other trends, which we were frankly surprised not to find in our data, other methods such as the EWMA or those proposed by Nomikos and MacGregor [NM95] might be more appropriate and effective.…”
Section: Applying Spc To Syndromic Surveillancementioning
confidence: 97%
“…Each element of the score vectors (t r ) corresponds to a single batch and depicts the overall variability of this batch with respect to the other batches in the database throughout the entire batch duration (Nomikos and MacGregor, 1995). Usually, a few principal components can express most of the variability in the data when there is a high degree of correlation among the data (R << min(I, JK)).…”
Section: Multiway Principal Component Analysismentioning
confidence: 99%
“…However, the prediction of the future behaviour of the evolving batch is necessary for the monitoring. In the literature, several methods to achieve the prediction of absent part of batches can be found [2,27,28].…”
Section: Kassidas Et Al's Approachmentioning
confidence: 99%
“…The Multivariate Statistical Process Control (SPC) monitoring scheme provides an on-line diagnostic tool to interrogate the latent model about possible reasons of faults in non-finished batches [2]. Later on, corrective actions can be applied to avoid future batches that are affected by the same faults.…”
Section: On-line Dtw Synchronization For Batch Monitoringmentioning
confidence: 99%
See 1 more Smart Citation