Near-Optimal Method for Siting and Sizing of Distributed Storage in a Transmission Network

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
187
0

Year Published

2016
2016
2021
2021

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 265 publications
(187 citation statements)
references
References 21 publications
0
187
0
Order By: Relevance
“…Constraints (6) - (8) represent capacity bounds on the (dis)charge power and storage capacity, with binary variable b h ensuring that the storage plant is operated with a strict separation of the electricity consumption and generation phase, i.e., p c h · p d h = 0 ∀ h. If however simultaneous charging and discharging is technically feasible (e.g., in certain pumped-hydro storage (PHS) plants), it is profitable to ignore the nonsimultaneity constraint during negative price periods. 7 The nonnegativity of c cyc and (9) -(10) represent the convex relaxation 8 of the max operator illustrated in Fig. 4, with C fix,e the investment cost of the energy-component of the storage plant.…”
Section: Day-ahead Electricity Storage Arbitragementioning
confidence: 99%
“…Constraints (6) - (8) represent capacity bounds on the (dis)charge power and storage capacity, with binary variable b h ensuring that the storage plant is operated with a strict separation of the electricity consumption and generation phase, i.e., p c h · p d h = 0 ∀ h. If however simultaneous charging and discharging is technically feasible (e.g., in certain pumped-hydro storage (PHS) plants), it is profitable to ignore the nonsimultaneity constraint during negative price periods. 7 The nonnegativity of c cyc and (9) -(10) represent the convex relaxation 8 of the max operator illustrated in Fig. 4, with C fix,e the investment cost of the energy-component of the storage plant.…”
Section: Day-ahead Electricity Storage Arbitragementioning
confidence: 99%
“…In [9] the storage deployment problem is combined with transmission expansion planning problem without considering wind power generation and uncertainties. A three stage allocation of energy storage devices is proposed in [10] based on analyzing system operational costs for one year with probabilistic wind generation data. A multi-objective framework is presented in [11] with analyzing system operational costs and voltage improvements under limited number of scenarios for wind generation.…”
Section: Sets and Indices Gmentioning
confidence: 99%
“…Market participants are only incentivized to integrate new flexible resources when the investment is profitable. Although electricity storage plants can be used for many applications (e.g., arbitrage, portfolio optimization, frequency control, voltage support, black-start service [4,5]) and maximizing the value of storage requires the aggregation of different applications, one of the most studied and well-known applications is arbitraging day-ahead (DA) market electricity prices [6,7]. This article focuses on the arbitrage application as the sole revenue source.…”
Section: Motivationmentioning
confidence: 99%
“…7 The nonnegativity of c cyc and (9) - (10) represent the convex relaxation 8 of the max operator illustrated in Fig. 4, with C fix,e the investment cost of the energy-component of the storage plant.…”
mentioning
confidence: 99%
See 1 more Smart Citation