2023
DOI: 10.1007/s11047-023-09967-w
|View full text |Cite
|
Sign up to set email alerts
|

Neighbourhood search for energy minimisation in flexible job shops under fuzziness

Pablo García Gómez,
Camino R. Vela,
Inés González-Rodríguez

Abstract: Uncertainty pervades real life and supposes a challenge for all industrial processes as it makes it difficult to predict the outcome of otherwise risk-free activities. In particular, time deviation from projected objectives is one of the main sources of economic losses in manufacturing, not only for the delay in production but also for the energy consumed by the equipment during the additional unexpected time they have to work to complete their labour. In this work we deal with uncertainty in the flexible job … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 49 publications
0
1
0
Order By: Relevance
“…Several researches apply fuzzy logic to optimise the manufacturing scheduling. Most of these methods have a specific objective, for instance, minimising the total energy consumption and the makespan simultaneously 14 , 15 , 16 . Concerning the factors, some studies focused on either priority-aware scheduling 17 or time-based uncertainties 18 .…”
Section: Figure 1 Job Shop Scheduling By Manual and Algorithmic Waymentioning
confidence: 99%
“…Several researches apply fuzzy logic to optimise the manufacturing scheduling. Most of these methods have a specific objective, for instance, minimising the total energy consumption and the makespan simultaneously 14 , 15 , 16 . Concerning the factors, some studies focused on either priority-aware scheduling 17 or time-based uncertainties 18 .…”
Section: Figure 1 Job Shop Scheduling By Manual and Algorithmic Waymentioning
confidence: 99%