2012 IEEE Power and Energy Society General Meeting 2012
DOI: 10.1109/pesgm.2012.6345166
|View full text |Cite
|
Sign up to set email alerts
|

NERC's risk assessment of reliability performance

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2014
2014
2018
2018

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Herein, the risk assessment (RA), considering both severity and probability, has been cast as an effective index to evaluate the contingencies in terms of reliability [26]. For example, NERC is developing the risk information-based system planning strategy for bulk power systems [27]. Thus, the contingency with a high risk (i.e.…”
Section: Introductionmentioning
confidence: 99%
“…Herein, the risk assessment (RA), considering both severity and probability, has been cast as an effective index to evaluate the contingencies in terms of reliability [26]. For example, NERC is developing the risk information-based system planning strategy for bulk power systems [27]. Thus, the contingency with a high risk (i.e.…”
Section: Introductionmentioning
confidence: 99%