“…Herein, the risk assessment (RA), considering both severity and probability, has been cast as an effective index to evaluate the contingencies in terms of reliability [26]. For example, NERC is developing the risk information-based system planning strategy for bulk power systems [27]. Thus, the contingency with a high risk (i.e.…”