2011
DOI: 10.1016/j.fusengdes.2011.02.100
|View full text |Cite
|
Sign up to set email alerts
|

New high power CW test facilities for ITER ICRH components testing

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
10
0

Year Published

2012
2012
2023
2023

Publication Types

Select...
6

Relationship

2
4

Authors

Journals

citations
Cited by 15 publications
(10 citation statements)
references
References 1 publication
0
10
0
Order By: Relevance
“…A test of the RF strap configuration at high power is also under preparation. It will exploit the TITAN facility located in CEA-Cadarache [10].…”
Section: Discussionmentioning
confidence: 99%
“…A test of the RF strap configuration at high power is also under preparation. It will exploit the TITAN facility located in CEA-Cadarache [10].…”
Section: Discussionmentioning
confidence: 99%
“…All the inner and outer conductors of the resonator are actively water cooled by a cold water loop (4 bar/20°C). The resonator, located in the TITAN facility [25], can also be connected to a hot water loop compatible with ITER specifications (up to 44 bar/250°C). The water cooling temperature during RF operations in the ITER IC antenna is estimated to be 90°C at the contact location.…”
Section: Figure 1 General Description Of the Rf Resonatormentioning
confidence: 99%
“…Once the antenna will be fully assembled, a full leak test on the dedicated TITAN test bed [7], [8] will be performed.…”
Section: Leak Test Procedures Used For the West Icrh Antennamentioning
confidence: 99%