“…It is observable that the DeLOCP with the mutation strategy of DE/Target-to-Best/1 and Hybrid DE/Rand/1 and DE/Best/1 have produced the best solution: fitness function = 3054 (with average labor demand = 13.8, maximum labor demand = 16.0, minimum labor demand = 12, and project duration = 32.0 (shift)). The optimized crew sizes and start times of all activities are [13,7,4,9,6,4,6,7,8,8,13] and [1,2,2,6,14,9,9,25,27,17,32], respectively. The optimized daily labor demand is illustrated in Figure 4.…”