2023
DOI: 10.1007/s11431-022-2180-7
|View full text |Cite
|
Sign up to set email alerts
|

Numerical and experimental study on the refrigeration performance of a variable-section gas wave oscillation tube

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 9 publications
(2 citation statements)
references
References 32 publications
0
2
0
Order By: Relevance
“…Buildings 2024, 14,1314 subjected to vertical tensile stress, with a maximum val ments are subjected to vertical compressive stress, with a (ii) End section (Figure 9b):…”
Section: Analysis Of Plain Concrete Model and Determination Of Reinfo...mentioning
confidence: 99%
See 1 more Smart Citation
“…Buildings 2024, 14,1314 subjected to vertical tensile stress, with a maximum val ments are subjected to vertical compressive stress, with a (ii) End section (Figure 9b):…”
Section: Analysis Of Plain Concrete Model and Determination Of Reinfo...mentioning
confidence: 99%
“…Considering the transportation and lifting requirements of prefabricated components, an ideal prefabricated concrete staircase should have the characteristic of being easy to move. There are two corresponding technical ideas: one idea is to first divide and then assemble [13][14][15][16]; another idea is to develop lightweight prefabricated stairs, such as lightweight prefabricated stairs equipped with integrated lightweight staircase partition wall panels [17], lightweight prefabricated stairs using lightweight materials and steel wire mesh [18], lightweight prefabricated stairs using "double beam + thin slab" construction with weight-reducing cavities in the steps [19], and lightweight prefabricated stairs setting longitudinal continuous holes in the diagonal staircase [20]. By comparison, the technology concept of first slicing and then assembling has relatively high implementation difficulty, a relatively large on-site construction workload, and many unstable factors.…”
Section: Introductionmentioning
confidence: 99%