“…This is because if a single PEBB fails, only a direct replacement is required to maintain proper power system operation. Implementing ATC and RUL methods facilitates this capability, allowing PEBBs to adapt their operation to align with scheduled maintenance, thereby increasing the [27], [117], [215], [216], [217], [218]), • Peak current ( [26], [27], [117], [219], [216], [220]), • Duty ratio ( [215]), • Adjust current restriction to coolant temperature and frequency ( [219]).…”