2024
DOI: 10.3390/jmse12030456
|View full text |Cite
|
Sign up to set email alerts
|

Numerical Simulation of Construction Disturbances during Bidirectional Advancement of Undersea Large-Diameter Dual-Line Shield Tunneling

Tao Wang,
Yu Xiang,
Liyuan Liu
et al.

Abstract: Relying on the Mawan undersea large-diameter, dual-line, mud–water-balanced shield tunnel project and focusing on the characteristics of the tunnel, such as the complex geological conditions at the expected intersection location and the existence of a superimposed perturbation or secondary perturbation effect, theoretical calculations and three-dimensional numerical simulations were used to reveal the ground disturbance situation of the large-diameter, two-lane mud–water shield when it is propelled under vario… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 23 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?