2023
DOI: 10.1016/j.geoen.2023.211939
|View full text |Cite
|
Sign up to set email alerts
|

Numerical simulation study on the effectiveness of temporary plugging and fracturing in deep coal seam to construct complex fracture network

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2025
2025

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(1 citation statement)
references
References 41 publications
0
1
0
Order By: Relevance
“…This process involves the propagation of hydraulic fractures driven by high-pressure fluids, as well as complex physical phenomena such as the interference of hydraulic fractures and the interaction between hydraulic fractures and the interfaces of the reservoir layers. , When conducting hydraulic fracturing in deep shale formations, it is important to consider the varying layers of cementation between reservoirs of different properties . These differences can lead to the loss of fracturing fluid, which can significantly impact the effectiveness of reservoir modification. Therefore, it is important to not overlook the role of interface cementation during the hydraulic fracturing construction process.…”
Section: Introductionmentioning
confidence: 99%
“…This process involves the propagation of hydraulic fractures driven by high-pressure fluids, as well as complex physical phenomena such as the interference of hydraulic fractures and the interaction between hydraulic fractures and the interfaces of the reservoir layers. , When conducting hydraulic fracturing in deep shale formations, it is important to consider the varying layers of cementation between reservoirs of different properties . These differences can lead to the loss of fracturing fluid, which can significantly impact the effectiveness of reservoir modification. Therefore, it is important to not overlook the role of interface cementation during the hydraulic fracturing construction process.…”
Section: Introductionmentioning
confidence: 99%