2023
DOI: 10.1051/e3sconf/202336501011
|View full text |Cite
|
Sign up to set email alerts
|

Numerical study of flow around flat plate using higher-order accuracy scheme

Abstract: Analytical methods exist to solve the problems of hydromechanics and heat transfer, but it is not possible to obtain the solution to some inhomogeneous and nonlinear problems of hydromechanics and heat transfer by analytical methods. The solution to such problems is carried out using numerical methods. Currently, there are many textbooks and monographs on numerical methods for solving problems of hydromechanics, thermal conductivity, heat and mass transfer, and others. The article presents the results of a num… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 19 publications
(2 citation statements)
references
References 11 publications
0
2
0
Order By: Relevance
“…Various construction organizations, research and project institutes offer organizational and technological solutions for adding additional floors, expanding buildings, expanding erkers and loggias, Diamond and strengthening structures, creating energy savings in buildings, replacing engineering networks, repairing roofs, etc. However, not all recommendations of foreign construction engineers can be applied to the territory of the Respublka of Uzbekistan [5][6][7][8][9][10][11][12][13][14][15][16][17][18][19][20][21][22][23].…”
Section: Resultsmentioning
confidence: 99%
See 1 more Smart Citation
“…Various construction organizations, research and project institutes offer organizational and technological solutions for adding additional floors, expanding buildings, expanding erkers and loggias, Diamond and strengthening structures, creating energy savings in buildings, replacing engineering networks, repairing roofs, etc. However, not all recommendations of foreign construction engineers can be applied to the territory of the Respublka of Uzbekistan [5][6][7][8][9][10][11][12][13][14][15][16][17][18][19][20][21][22][23].…”
Section: Resultsmentioning
confidence: 99%
“…At the same time, since September 1, 2022, the introduction of the procedure for obtaining conclusions on earthquake relations to objects belonging to Category IV (objects with the highest risk factor), the risk factor under which a new construction is planned in the seismic active zones of our republic, And since October 1, it is another aspect of recognition that the procedure for introducing proposals for the gradual introduction of new housing in the territory of the Republic into the local state authorities in the place of seismically weak and accident-prone housing, which, according to the results of which the period of operation has been completed, has been established and the practice of Starting in 2023, a series of construction planned or selected buildings and structures with a height of 9 floors or higher in the seismic active zones of the Republic, testing and inspection using vibrodynamic equipment or modern digitized instrumental equipment was established in order to increase the earthquake intensity, ensure quality and eliminate defects in advance [4][5][6][7][8][9][10][11][12][13][14][15][16][17][18][19][20][21][22][23].…”
Section: Fundamentals Of Ensuring Seismic Priority and Safety Of Buil...mentioning
confidence: 99%