Obstacles Preventing the Off-Site Prefabrication of Timber and MEP Services: Qualitative Analyses from Builders and Suppliers in Australia

Abstract: Limited empirical and qualitative studies focus on the detailed processes and obstacles for coordinating off-site prefabrication between builders and suppliers. This research aims to identify and address the obstacles that currently prevent the further expansion of off-site prefabrication, with a research scope on timber and mechanical/electrical/plumbing (MEP) services in construction projects. The focal point of this research is to highlight their obstacles. A total of forty interviews were conducted and ana… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
5
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
4
1
1

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(5 citation statements)
references
References 30 publications
0
5
0
Order By: Relevance
“…While the "2015 Solid Timber Construction Report" summarizes 18 case studies regarding cost and schedule savings [26], few studies focus on the detailed processes and obstacles that impede collaboration between builders and suppliers in terms of the coordination of off-site prefabrication [27]. This is attributed to the fact that collaboration, in general, is lacking [28].…”
Section: Challengesmentioning
confidence: 99%
“…While the "2015 Solid Timber Construction Report" summarizes 18 case studies regarding cost and schedule savings [26], few studies focus on the detailed processes and obstacles that impede collaboration between builders and suppliers in terms of the coordination of off-site prefabrication [27]. This is attributed to the fact that collaboration, in general, is lacking [28].…”
Section: Challengesmentioning
confidence: 99%
“…Previous research has interpreted and defined prefabrication (also called modularization) differently based on its subtle regional, geographical, or proximal aspects [43]. Modular construction entails designing, manufacturing, transporting, and assembling building components for rapid site assembly with faster completion than on-site construction [44].…”
Section: Overview Of Included Studiesmentioning
confidence: 99%
“…According to Lopez et al [43], Australian builders and suppliers face challenges and opportunities for off-site prefabrication of timber components and MEP services. The study compared and analyzed interview data from four builders and four suppliers.…”
mentioning
confidence: 99%
“…Low tolerance between manufacturing parts and on-site assembly (Lopez et al, 2022;Rahman and Asce, 2014;Wuni and Shen, 2020a)…”
Section: F19mentioning
confidence: 99%