2003
DOI: 10.1117/12.459382
|View full text |Cite
|
Sign up to set email alerts
|

'OHANA phase II: a prototype demonstrator of fiber-linked interferometry between very large telescopes

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2003
2003
2017
2017

Publication Types

Select...
4
2
1

Relationship

4
3

Authors

Journals

citations
Cited by 10 publications
(4 citation statements)
references
References 7 publications
0
4
0
Order By: Relevance
“…We expect to start a part of the scientific observing runs in the fall of 2004 for stars selected suitably for our interferometer, single stars, binaries, and variables. Large array proposals as `OHANA 10,11,12,13,14 and the next stage of MIRA 10,15 are also in sight for us. The latter consists of D>1m, B>500m, and N>3 telescopes, and we hope to make further considerations how to realize it.…”
Section: Discussionmentioning
confidence: 99%
“…We expect to start a part of the scientific observing runs in the fall of 2004 for stars selected suitably for our interferometer, single stars, binaries, and variables. Large array proposals as `OHANA 10,11,12,13,14 and the next stage of MIRA 10,15 are also in sight for us. The latter consists of D>1m, B>500m, and N>3 telescopes, and we hope to make further considerations how to realize it.…”
Section: Discussionmentioning
confidence: 99%
“…The use of single mode fibers for beam transport might be crucial for the heterodyne architecture. Much work has been done in this area for the OHANA 21 project and new lab results were recently presented at this meeting (Anderson et al).…”
Section: Technology Spotlightsmentioning
confidence: 99%
“…OHANA 13 has the maximum baseline of 800m which requires a compensation of a few hundred meters delay under no exclusive delay line building condition. In the Phase II of the project, a delay line system of +-40m for the early stages is considered to be put in the coude room of CFHT 14 , because Keck delay line system will not be always available for various baselines of OHANA. It is desirable to construct a delay line system for hundreds of meters delay in the CFHT room for the late stages 15,16 .…”
Section: An 800m Delay Line Concept For Ohana At Cfhtmentioning
confidence: 99%