Mahakam block has supported Indonesia's Oil and Gas production with over 40 years of deliverability. Presently, along with its maturity cycle, comes the challenge of a steeply declining matured field with indicators of marginal reserves, included unconsolidated sand reservoirs as one of the main contributors which required sand control. In addition, future offshore platform development emerged the urgency of light deployment and robust sand control. Deep dive into the methodology, it was mandatorily to revisit what techniques available on the shelves and what is the current technology has to offer. Mahakam subsurface sand controls were classified into gravel pack, open hole stand-alone screen, chemical sand consolidation (SCON), and thru-tubing metal screen. These also respectively account for the highest to the lowest of operational investment, associated production contribution, and its reliability. Thru tubing screen methodology in cased-hole application showed weakness by plugging and erosion issue resulting on minimum utilization as lowest end subsurface sand control means. Several normative elements factored into it, with the root cause of screen placement. It was avoided to install metallic screen in front perforation due to direct jetting during the natural sand packing (NSP) process, causing an installation at slightly above perforation with the absence of stable NSP and screen size selection complexity. Thru-tubing screen with higher strata of material, silicon carbide or ceramic, was selected as a pioneer on new installation philosophy to tackle erosion issue. It was combined with the developed Mahakam sand grain size map as a screen size selection guideline. A confidence pseudo-straddle thru-tubing ceramic screen (TTCS) installation campaign in front of perforation interval was explored on swamp (Tunu) and offshore (Peciko) gas wells. This technique adopts open hole SAS with retrievable concept optimizing slickline intervention. Perfection of the techniques is a process that continues. However, based on the current study and trial results on wells installation throughout 2020 to 2021, positive results were achieved: Operation simplicity with minimum operation HSE risk, Sand free production delivery addressing highly unconsolidated reservoir with widely distributed sand grain by mitigating the risk of screen erosion, The average cost savings were 66% in delta and 76% in offshore compared to allocated SCON budget, Cummulative gas deliverability increased by more than 200% compared to previous thru-tubing metal screen performance, Performance exceeded average SCON production rate and in-situ gas velocity limit at several installations, The installation method had a 100% retrievability success ratio from all retrieval attempts on inactive wells installation, It had no damaging effect to the reservoir when remedial by SCON was required, The installation concept adoption has been proven on highly deviated and unique completion configurations. This enlightenment boosted confidence in both the assessment technique and installation philosophy. This initiative would enable the production of Mahakam marginal sandy reservoir while sparking to a wider application as an alternative robust and light sand control solution.
Mahakam block has supported Indonesia's Oil and Gas production with over 40 years of deliverability. Presently, along with its maturity cycle, comes the challenge of a steeply declining matured field with indicators of marginal reserves, included unconsolidated sand reservoirs as one of the main contributors which required sand control. In addition, future offshore platform development emerged the urgency of light deployment and robust sand control. Deep dive into the methodology, it was mandatorily to revisit what techniques available on the shelves and what is the current technology has to offer. Mahakam subsurface sand controls were classified into gravel pack, open hole stand-alone screen, chemical sand consolidation (SCON), and thru-tubing metal screen. These also respectively account for the highest to the lowest of operational investment, associated production contribution, and its reliability. Thru tubing screen methodology in cased-hole application showed weakness by plugging and erosion issue resulting on minimum utilization as lowest end subsurface sand control means. Several normative elements factored into it, with the root cause of screen placement. It was avoided to install metallic screen in front perforation due to direct jetting during the natural sand packing (NSP) process, causing an installation at slightly above perforation with the absence of stable NSP and screen size selection complexity. Thru-tubing screen with higher strata of material, silicon carbide or ceramic, was selected as a pioneer on new installation philosophy to tackle erosion issue. It was combined with the developed Mahakam sand grain size map as a screen size selection guideline. A confidence pseudo-straddle thru-tubing ceramic screen (TTCS) installation campaign in front of perforation interval was explored on swamp (Tunu) and offshore (Peciko) gas wells. This technique adopts open hole SAS with retrievable concept optimizing slickline intervention. Perfection of the techniques is a process that continues. However, based on the current study and trial results on wells installation throughout 2020 to 2021, positive results were achieved: Operation simplicity with minimum operation HSE risk, Sand free production delivery addressing highly unconsolidated reservoir with widely distributed sand grain by mitigating the risk of screen erosion, The average cost savings were 66% in delta and 76% in offshore compared to allocated SCON budget, Cummulative gas deliverability increased by more than 200% compared to previous thru-tubing metal screen performance, Performance exceeded average SCON production rate and in-situ gas velocity limit at several installations, The installation method had a 100% retrievability success ratio from all retrieval attempts on inactive wells installation, It had no damaging effect to the reservoir when remedial by SCON was required, The installation concept adoption has been proven on highly deviated and unique completion configurations. This enlightenment boosted confidence in both the assessment technique and installation philosophy. This initiative would enable the production of Mahakam marginal sandy reservoir while sparking to a wider application as an alternative robust and light sand control solution.
Mahakam Block is a huge oil and gas concession managed by PT. Pertamina Hulu Mahakam (PHM) and located in deltaic and offshore environment in East Kalimantan, Indonesia. Until today, the field has produced oil and gas for more than 50 years and categorized as "brown field" due to its declining production and marginal reserve potential. This condition has led to numerous effort to boost efficiency in well delivery from drilling perspective such that the reserve could be produced more economically. One of the effort that has been done to create a well to be more economical is by increasing the Rate of Penetration (ROP). An increase in ROP would directly impact on well duration that could be finished faster in such that it would also impact on much lower well cost. There are several key factors that influence ROP, yet the most crucial part is coming from drilling bit design that is used to drill the formation. Incompatibility between bit design with formation and directional drive type would often result in slow drilling progress and thus would make a well less profitable. To support this idea, the operator has launched a campaign called MAXIDRILL with aim to have a persistent excellent drilling performance from ROP perspective. Selective approach to different bit designs and bit suppliers has brought the operator to conduct the first trial in Indonesia utilizing a one inch PDC cutter drill bit. Besides the effort to increase well economics by increasing ROP using various bit designs through MAXIDRILL Campaign, PHM also tries to implement new set of well architecture dedicated specifically for developing the shallow hydrocarbon zone in Mahakam in general, and in Tunu Field in particular. With this new type of architecture, it allows drilling with 9-1/2″ hole to be done straight from 20″ Conductor Pipe down to well final target depth in single phase, where next 3-1/2″ production tubing will be run and cemented in place. The new design of architecture is called "One Phase Well". This novel innovation was initiated in 2019, where to date, the operator has drilled more than 30 wells without any incident. With the learning curve that has turned into industrialization steps. More and more shorter well duration is born with these two initiatives, MAXIDRILL and One Phase Well. Ultimately, with the spirit of these two initiatives for bringing down well duration in gain for much better well economics has successfully set a two record breaking performance in Mahakam: 1) Being the fastest On Bottom ROP and 2) Being the fastest well ever delivered in Mahakam and Indonesia which is under two days.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.