Operation experience of solar power plants connected to the Russian distributed grid

Abstract: The islanding condition of grid-tied solar power plant with hydro power plant of commensurable power is considered in this article. Based on the results of the article, the relevant conclusions were drawn.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2019
2019
2020
2020

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 9 publications
0
1
0
Order By: Relevance
“…In the face of declining continental hydrocarbon reserves around the world, interest in Arctic resources has increased dramatically, including on the shelf zone. A significant amount of research by scientists and practitioners [1,2,3,4,5,6] is devoted to the development of the resource base of the Arctic, which is caused by the state's installation for the mastering of the Arctic zone of the Russian Federation.…”
Section: Introductionmentioning
confidence: 99%
“…In the face of declining continental hydrocarbon reserves around the world, interest in Arctic resources has increased dramatically, including on the shelf zone. A significant amount of research by scientists and practitioners [1,2,3,4,5,6] is devoted to the development of the resource base of the Arctic, which is caused by the state's installation for the mastering of the Arctic zone of the Russian Federation.…”
Section: Introductionmentioning
confidence: 99%