Operation mode selection algorithm development of a wind-diesel power plant supply complex

Abstract: The power supply system is affected by external disturbances, so it should be stable and operate normally in compliance with power quality standards. The power supply system goes into abnormal modes operation when, after a short-term failure or disturbance, it does not restore normal mode. The electrical complex, which includes a wind power plant, as well as a battery and a diesel generator connected in parallel, is able to provide reliable power supply to consumers which meets the power quality indicators. Th… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
11
0
1

Year Published

2022
2022
2024
2024

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 16 publications
(12 citation statements)
references
References 19 publications
0
11
0
1
Order By: Relevance
“…When selecting alternatives, we have to consider a large number of conflicting requirements and therefore assess the decision options according to many criteria. A distinguishing feature of the tasks being solved today is their multicriteriality, so decision makers have to assess a large variety of forces, influences, interests, and consequences defining the decision options [15]. It should be noted that losses arising in power lines, lighting losses and internal losses in conductors are not included in the calculations.…”
Section: Efficiency Assessment Systems Decision Modelmentioning
confidence: 99%
See 1 more Smart Citation
“…When selecting alternatives, we have to consider a large number of conflicting requirements and therefore assess the decision options according to many criteria. A distinguishing feature of the tasks being solved today is their multicriteriality, so decision makers have to assess a large variety of forces, influences, interests, and consequences defining the decision options [15]. It should be noted that losses arising in power lines, lighting losses and internal losses in conductors are not included in the calculations.…”
Section: Efficiency Assessment Systems Decision Modelmentioning
confidence: 99%
“…The process of power network system design is rather time-consuming -a good deal of time is required to search for the necessary information, compile reports and analyze them, to review a large number of articles, reference books, calculation methods, lists of electrical equipment, its characteristics, etc. [15].…”
Section: Introductionmentioning
confidence: 99%
“…Modern technologies make it possible to combine groups of personal computers into complex computing systems that can significantly increase the speed of calculations and, accordingly, the control module's response time of the nature or intensity of input action changes [19,20]. Until recently, such computer systems were the main means of technical processes' mathematical modeling, including automatic control systems modeling [21,22]. High-performance computing systems based on NVidia graphics cards have appeared on the computer systems market.…”
Section: Problem Statementmentioning
confidence: 99%
“…Countries-participants of the global energy market-should not ignore global changes [28]. These include the energy crisis, partially provoked by the accelerated development of re-Energies 2023, 16, 3185 2 of 23 newable energy technologies [29][30][31][32] in countries with an insufficient level of technological development. Under such circumstances, the lack of protection mechanisms in the form of technology might threaten not only energy security [33,34], but also the sustainability of the whole country's economic system [35][36][37].…”
Section: Introductionmentioning
confidence: 99%