2015
DOI: 10.7763/ijet.2015.v7.843
|View full text |Cite
|
Sign up to set email alerts
|

Operation Time Variability in Multi Product Unpaced Production Lines

Abstract: Abstract-In this paper a simulation study has been carried out on unpaced reliable and unreliable production lines having multiple products processing in batches with setup / changeover time. The aim of this study is to evaluate the design of multi product production lines operating under operation time variability for different products and compare the performance measures between reliable and unreliable lines.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2016
2016
2021
2021

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
references
References 20 publications
0
0
0
Order By: Relevance