Operational Experience and Initial Results from the First Test Period at CO2 Technology Centre Mongstad

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
13
0

Year Published

2013
2013
2020
2020

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 8 publications
(13 citation statements)
references
References 1 publication
0
13
0
Order By: Relevance
“…The Technology Centre Mongstad (TCM) test facility is located next to the Equinor oil renery in Mongstad, Norway. The TCM amine absorption plant is designed to be exible with two possible congurations that typically captures 85% of the CO 2 from dierent ue gas slipstreams [38,39].…”
Section: Plant Descriptionmentioning
confidence: 99%
See 1 more Smart Citation
“…The Technology Centre Mongstad (TCM) test facility is located next to the Equinor oil renery in Mongstad, Norway. The TCM amine absorption plant is designed to be exible with two possible congurations that typically captures 85% of the CO 2 from dierent ue gas slipstreams [38,39].…”
Section: Plant Descriptionmentioning
confidence: 99%
“…A detailed description of the measurement instruments used to monitor stream conditions and composition is available in previous contributions [38,44,39,41,45], which also include a detailed analysis of measurement accuracy, bias and precision (i.e., quantication of uncertainty and error).…”
Section: Experimental Measurements and Data Processingmentioning
confidence: 99%
“…Post combustion CO2 capture using absorption processes is currently the most mature technology for CCS and over the last years several pilot plants and test centres have been or are being built to test a variety of absorbents, e.g. Technology Centre Mongstad (TCM) in Norway (Andersson et al, 2013;Jönsson and Telikapalli, 2013), International test Centre (ITC) in Canada (Skoropad et al, 2003;Wilson et al, 2003), several pilots in Australia (CSIRO) (Cousins et al, 2012). Additionally a full scale plant has been built at Boundary Dam Canada.…”
Section: Introductionmentioning
confidence: 99%
“…solvent flow rates, absorber packing heights, stripper pressures, reboiler heat duties, lean amine and cross heat exchanger duties, absorber water wash temperatures and flow rates with or without acid injections, anti-foam solution injections, etc. [1,2] The campaign described in the current paper was conducted at TCM DA in the period December 2013 to February 2014 as a part of Aker Solutions' test period. In general, during the campaign the aqueous 30 wt% monoethanolamine (MEA) solvent system was applied treating the flue gas from the CHP plant.…”
Section: Introductionmentioning
confidence: 99%