2017
DOI: 10.1016/j.renene.2016.10.072
|View full text |Cite
|
Sign up to set email alerts
|

Opportunistic maintenance for wind turbines considering imperfect, reliability-based maintenance

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
41
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 96 publications
(41 citation statements)
references
References 16 publications
0
41
0
Order By: Relevance
“…Maintenance planning, which is an indispensable necessity for the design and operation of an effective maintenance management system, has led to the development of different maintenance planning strategies over time. The three of these strategies are; reliability-based maintenance [8], state-based maintenance [9], and finally risk-based maintenance [10]. In this study, considering the requirements for the operation of hydroelectric power facilities, which are selected as the application area and mentioned in Section 2, it is considered appropriate to take the risk-based maintenance planning strategy which has recently increased the interest to form the maintenance plans.…”
Section: Studies In the Literaturementioning
confidence: 99%
See 1 more Smart Citation
“…Maintenance planning, which is an indispensable necessity for the design and operation of an effective maintenance management system, has led to the development of different maintenance planning strategies over time. The three of these strategies are; reliability-based maintenance [8], state-based maintenance [9], and finally risk-based maintenance [10]. In this study, considering the requirements for the operation of hydroelectric power facilities, which are selected as the application area and mentioned in Section 2, it is considered appropriate to take the risk-based maintenance planning strategy which has recently increased the interest to form the maintenance plans.…”
Section: Studies In the Literaturementioning
confidence: 99%
“…Step 5: The consistency ratio (CR) of the judgments in each paired comparison matrix should be calculated in order to measure whether the decision-maker has consistently compared the values in the hierarchy to the elements in the hierarchy. In order to calculate the CR value, the first basic value (λ) of the binary comparison matrix must be calculated using Equations (6)- (8). The D column vector is obtained by multiplying the matrix A with the W priority vector (Equation (6)).…”
Section: Equally Importantmentioning
confidence: 99%
“…[20] An opportunistic maintenance approach considering a reliability-based imperfect maintenance schedule was proposed in Ref. [21], which solved the problem that maintenance actions did not always return the system to "as good as new" condition. A wind-centered maintenance strategy integrating multiple maintenance opportunities and diverse impacts of wind conditions was designed in Ref.…”
Section: Introductionmentioning
confidence: 99%
“…Meanwhile, many researchers have theoretically investigated the opportunistic maintenance strategy from a different perspective. In [16], a two-level maintenance threshold strategy for wind farms was developed, considering opportunistic maintenance and imperfect maintenance based on reliability. In [17], opportunistic condition-based maintenance for systems subjected to degradation and shocks was proposed to determine an optimal maintenance policy for multi-bladed offshore wind turbines.…”
Section: Introductionmentioning
confidence: 99%