“…Furthermore, there is a substantial body of literature on the simultaneous installation of EVCS with DGs and DSTAT-COMs/capacitors. Table-1 [2], [9], [10], [11], [12], [13], [14], [15], [16], [17], [18], [19], [20], [21], [22], [23], [24], [25], [26], [27], [28], [29], [30], [31], [32], [33], [34], [35], [36] provides a complete review of current research on EVCS planning using Distribution Generator (DG), Capacitor, Network Reconfiguration (NR), Battery Energy Storage System (BESS), and DSTATCOM for various types of distribution systems, optimization methodologies, and objective functions.…”