2008
DOI: 10.1080/00207540802230330
|View full text |Cite
|
Sign up to set email alerts
|

Optimal batch quantity models for a lean production system with in-cycle rework and scrap

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
31
0

Year Published

2009
2009
2021
2021

Publication Types

Select...
8
2

Relationship

0
10

Authors

Journals

citations
Cited by 81 publications
(31 citation statements)
references
References 25 publications
0
31
0
Order By: Relevance
“…To meet the direction and requirements of lean and sustainable manufacturing, management of scraps and reworks are an important issue for manufacturing systems [40,41]. Inderfurth et al [42] proposed an inventory model to ensure that the defective items also produced commonly in same production facility.…”
Section: Literature Reviewmentioning
confidence: 99%
“…To meet the direction and requirements of lean and sustainable manufacturing, management of scraps and reworks are an important issue for manufacturing systems [40,41]. Inderfurth et al [42] proposed an inventory model to ensure that the defective items also produced commonly in same production facility.…”
Section: Literature Reviewmentioning
confidence: 99%
“…C ardenasBarr on [11] presented some modi cations to the model developed by Jamal et al [10] and provided improved lot size policy through numerical examples. Biswas and Sarker [12] came with the idea that scrap products could be identi ed before, during, and after the rework process in a lean manufacturing system. C ardenasBarr on [13] further extended the model of Jamal et al [10] by incorporating planned backorders to the single-stage manufacturing setup.…”
Section: Introductionmentioning
confidence: 99%
“…Sarker et al (2008) addressed the problem connecting to reworking of imperfect objects in a multi-stage manufacturing method by considering two operational policies: reworking of imperfect objects within the same cycle and after N cycles. Biswas and Sarker (2008) described an inventory system of a solitary manufacturing procedure with an in-cycle rework strategy of fragment with complete analysis. Sana (2011) developed an integrated production inventory model of perfect and imperfect quality products in a three-layer supply chain.…”
Section: Introductionmentioning
confidence: 99%