2016
DOI: 10.1109/tpwrs.2016.2521700
|View full text |Cite
|
Sign up to set email alerts
|

Optimal Cable Design of Wind Farms: The Infrastructure and Losses Cost Minimization Case

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
81
0
5

Year Published

2017
2017
2021
2021

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 57 publications
(86 citation statements)
references
References 17 publications
0
81
0
5
Order By: Relevance
“…Note that the previously defined decision variables x ij and y k ij , do not include any information related to the cable type selected in a given arc. This is because the cable type selection process is handled in a pre-processing stage, given that all the required data is present, and the task is totally independent to any other part of the desired tree(s) [7]. This allows integrating more complex power flow and total electrical power losses models, increasing the accuracy without compromising the computational efficiency.…”
Section: A Cost Coefficientsmentioning
confidence: 99%
“…Note that the previously defined decision variables x ij and y k ij , do not include any information related to the cable type selected in a given arc. This is because the cable type selection process is handled in a pre-processing stage, given that all the required data is present, and the task is totally independent to any other part of the desired tree(s) [7]. This allows integrating more complex power flow and total electrical power losses models, increasing the accuracy without compromising the computational efficiency.…”
Section: A Cost Coefficientsmentioning
confidence: 99%
“…Especially for offshore wind farms, 20% of total installation cost is resulted from cable and cable installation cost. Total cable cost is proportional with the length of total cables installed among turbines and transmitter [6][7][8][9][10]. The cable cost can be decreased in overall up to 10% by optimizing the cable layout problem [11].…”
Section: Literature Reviewmentioning
confidence: 99%
“…That's why, numerous studies to solve CL problem have used heuristic methods [13][14][15][16]. On the other hand, several studies are based on exact optimization models such as mixed integer linear programming (MILP) models [6,8,10,[17][18][19][20]. Hertz et al [8] included parallel cables in their study that can be installed in the same dug hole for onshore wind farms.…”
Section: Literature Reviewmentioning
confidence: 99%
See 1 more Smart Citation
“…Due to the large number of constraints and the intrinsic complexity of the problem, many papers (including [8,15,20,21,25] among others) prefer to use ad-hoc heuristics. Just few articles from the literature use Mixed Integer Linear Programming (MILP) for cable routing; see, for example [2,3,6,7,9,17].…”
Section: Introductionmentioning
confidence: 99%