2019
DOI: 10.1049/iet-stg.2018.0054
|View full text |Cite
|
Sign up to set email alerts
|

Optimal distribution system restoration using PHEVs

Abstract: Power outages cost billions of dollars every year and jeopardise the lives of hospital patients. Traditionally, power distribution system takes a long time to recover after a major blackout, due to its top-down operation strategy. New technologies in modern distribution systems bring opportunities and challenges to distribution system restoration. As fast response energy resources, plug-in hybrid electric vehicles (PHEVs) can accelerate the load pickup by compensating the imbalance between available generation… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
14
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
3
3
1

Relationship

1
6

Authors

Journals

citations
Cited by 29 publications
(14 citation statements)
references
References 32 publications
0
14
0
Order By: Relevance
“…The operational costs including capital expenditures (CAPEX) are considered for generation assets based on National Renewable Energy Laboratory's (NREL) advanced technology baseline [23]. The H2 demand requested by FCEVs is calculated based on the method presented in [24]. These FCEVs are considered as Honda Clarity models [25] assuming that these cars arrive at the H2 fueling station with 45% H2 fuel in their tanks.…”
Section: Simulation Results and Analysismentioning
confidence: 99%
See 2 more Smart Citations
“…The operational costs including capital expenditures (CAPEX) are considered for generation assets based on National Renewable Energy Laboratory's (NREL) advanced technology baseline [23]. The H2 demand requested by FCEVs is calculated based on the method presented in [24]. These FCEVs are considered as Honda Clarity models [25] assuming that these cars arrive at the H2 fueling station with 45% H2 fuel in their tanks.…”
Section: Simulation Results and Analysismentioning
confidence: 99%
“…To show the flexibility of H2 systems during the normal and emergency operations, three CBDRS are considered. In (23) and (24), CBDR signals, shown as P DR Sgl , are expressed for electrolyzers and FC units. In the case of any external signal from DSO, based on their available capacity (electrolyzer, storage tank, and FC units), H2 systems follow the signal and act as load or generation asset based on equations (23) and (24).…”
Section: Problem Formulationmentioning
confidence: 99%
See 1 more Smart Citation
“…In (5) and (6), x represents the data points of the detected signal and y represents the template appliance data points. R must be greater than the given threshold value, α, to verify the appliance detection method as shown in (7). This value α can be increased or reduced which would result in the detection of more or fewer appliances.…”
Section: B Appliance Classification and Detectionmentioning
confidence: 99%
“…Ozturk et al used a ToU tariff within a self organising home energy network to reduce prices for the customer [5]. DSR can help to reduce peak demand through the coordinated control of electric vehicles (EVs), and PVs [6], [7]. Amongst the literature, there are papers which model specific appliances, for example Good et al considered DSR based on thermal energy storage in the form of hot water storage [8].…”
Section: Introductionmentioning
confidence: 99%