2024
DOI: 10.1016/j.rineng.2024.101965
|View full text |Cite
|
Sign up to set email alerts
|

Optimal economical sizing of a PV-battery grid-connected system for fast charging station of electric vehicles using modified snake optimization algorithm

Abd El-Shafy A. Nafeh,
Abd El-Fattah A. Omran,
A. Elkholy
et al.
Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2024
2024
2025
2025

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 22 publications
(2 citation statements)
references
References 39 publications
0
2
0
Order By: Relevance
“…For monitoring the EV charging system, ML models like Adaptive Neuro-Fuzzy Inference System (ANFIS) and Artificial Neural Network (ANN) have been utilized in recent times [12]. Moreover, to optimize the charging stations, meta-heuristic optimization approaches, namely Particle Swarm Optimization (PSO) and Snake Optimization Algorithm (SOA) are implemented [13]. Furthermore, for managing the automatic S-PV-based EV charging system, DL approaches like Long Short Term Memory (LSTM), Reinforcement Learning (RL), and Gated Recurrent Unit (GRU) are introduced [14][15].…”
Section: Introductionmentioning
confidence: 99%
“…For monitoring the EV charging system, ML models like Adaptive Neuro-Fuzzy Inference System (ANFIS) and Artificial Neural Network (ANN) have been utilized in recent times [12]. Moreover, to optimize the charging stations, meta-heuristic optimization approaches, namely Particle Swarm Optimization (PSO) and Snake Optimization Algorithm (SOA) are implemented [13]. Furthermore, for managing the automatic S-PV-based EV charging system, DL approaches like Long Short Term Memory (LSTM), Reinforcement Learning (RL), and Gated Recurrent Unit (GRU) are introduced [14][15].…”
Section: Introductionmentioning
confidence: 99%
“…It resulted in a 1050 kW peak PV installation, an internal fleet of 300 electric cars and an additional fixed battery capacity of 450 kWh. Nafeh et al presented a methodology for the optimal sizing of a proposed PV battery grid-connected system for fast charging stations for electric vehicles in Cairo [9]. By shifting one's attention to the big international picture, one can observe that the increasing penetration of wind farms and photovoltaic parks in modern electricity grids results in stochastic electricity production with frequent peaks, which disturb the grid's operation and result in the dumping of large amounts of renewable energy.…”
Section: Introductionmentioning
confidence: 99%