2015 IEEE/ACS 12th International Conference of Computer Systems and Applications (AICCSA) 2015
DOI: 10.1109/aiccsa.2015.7507115
|View full text |Cite
|
Sign up to set email alerts
|

Optimal model transformation of BPMN to DEVS

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
13
0

Year Published

2016
2016
2024
2024

Publication Types

Select...
3
2
1

Relationship

2
4

Authors

Journals

citations
Cited by 6 publications
(13 citation statements)
references
References 15 publications
0
13
0
Order By: Relevance
“…The latter will be set with accordance to the modeled time constraints specification. During the execution, the business process or the activity, as model‐based DEVS 3 will not start up or finish when it wants, but it will ask the control model for authorization to do that. Therefore, the control model will respond, only if the time, yet the time constraints are well respected.…”
Section: Discussionmentioning
confidence: 99%
See 3 more Smart Citations
“…The latter will be set with accordance to the modeled time constraints specification. During the execution, the business process or the activity, as model‐based DEVS 3 will not start up or finish when it wants, but it will ask the control model for authorization to do that. Therefore, the control model will respond, only if the time, yet the time constraints are well respected.…”
Section: Discussionmentioning
confidence: 99%
“…Figure 2 illustrates the architecture of the overall model as a system, where the inputs are the business process in BPMN and a set of temporal constraints. Then the BP goes through the transformation to the DEVS formalism by applying the rules presented in Reference 3. Thus, by means of simulation, the modeler will analyze the resulted outputs.…”
Section: The Proposed Modelmentioning
confidence: 99%
See 2 more Smart Citations
“…Figure 1 illustrates the architecture of the overall model as a system, where the inputs are the business process in BPMN and a set of structural configuration. Then the BP goes through the transformation to the DSDEVS formalism by applying the rules presented in [25] and extended in this paper. The resulted model consists of a variant of the initial configurable business process implemented in DEVSJAVA.…”
Section: Network Modelsmentioning
confidence: 99%