2018
DOI: 10.1016/j.apenergy.2017.07.035
|View full text |Cite
|
Sign up to set email alerts
|

Optimal operation of an energy management system for a grid-connected smart building considering photovoltaics’ uncertainty and stochastic electric vehicles’ driving schedule

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
109
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
7
2

Relationship

0
9

Authors

Journals

citations
Cited by 298 publications
(126 citation statements)
references
References 42 publications
0
109
0
Order By: Relevance
“…Meanwhile, Dimitrios et al [39] proposed an energy management system for the smart building connected to a power system considering the uncertainties of PV generation and the operation schedule of electric vehicles. D. van der Meer et al [40] described his energy management system that predicts PV generations for charging electric vehicles by detailing the PV generation system.…”
Section: Related Researchmentioning
confidence: 99%
“…Meanwhile, Dimitrios et al [39] proposed an energy management system for the smart building connected to a power system considering the uncertainties of PV generation and the operation schedule of electric vehicles. D. van der Meer et al [40] described his energy management system that predicts PV generations for charging electric vehicles by detailing the PV generation system.…”
Section: Related Researchmentioning
confidence: 99%
“…Constraint (40) ensures null values for the intervals when the EV battery cannot be used. Constraint (41) calculates the fuel cost for each trip s. Constraint (42) gives the total cost of the fuel consumption. Constraint (43) is the binary and nonnegative restrictions.…”
Section: Plug-in Hybrid Ev Modelmentioning
confidence: 99%
“…However, they are not considered as appropriate for quick stops at ultra-fast charging stations along transit axes. Indeed, a key condition to implement such schemes is the idle time a vehicle remains attached to a plug, which makes sense at office buildings [9] or at home. A typical example was proposed by Quddus et al [10] with a sector coupling scheme between vehicles, charging stations, and commercial buildings, with hourly operational decisions for energy flows, but it does not address the minute-scale power peak issues of ultra-fast charging stations.…”
Section: Introductionmentioning
confidence: 99%