Optimal Operation of Interprovincial Hydropower System Including Xiluodu and Local Plants in Multiple Recipient Regions

Abstract: This paper focuses on the monthly operations of an interprovincial hydropower system (IHS) connected by ultrahigh voltage direct current lines. The IHS consists of the Xiluodu Hydropower Project, which ranks second in China, and local plants in multiple recipient regions. It simultaneously provides electricity for Zhejiang and Guangdong provinces and thus meets their complex operation requirements. This paper develops a multi-objective optimization model of maximizing the minimum of total hydropower generation… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
13
0

Year Published

2019
2019
2020
2020

Publication Types

Select...
10

Relationship

3
7

Authors

Journals

citations
Cited by 22 publications
(13 citation statements)
references
References 40 publications
0
13
0
Order By: Relevance
“…MCDA approaches are commonly used for evaluating energy policies, scenarios, and technologies [61][62][63]. For the evaluation of the presented scenarios, TOPSIS will be applied, which is a variant of MCDA that has been used frequently in energy planning and analysis (see e.g., [64][65][66]) (in order to provide insights on the robustness of the MCDA results with regard to the chosen MCDA tool, Appendix C offers a system performance analysis using the Preference Ranking Organization Method for Enrichment Evaluation (PROMETHEE) method). MCDA offers a systematic approach to complex decision problems involving multiple perspectives, uncertainty, and competing goals [67].…”
Section: System Performance and Evaluation Of Modeling Resultsmentioning
confidence: 99%
“…MCDA approaches are commonly used for evaluating energy policies, scenarios, and technologies [61][62][63]. For the evaluation of the presented scenarios, TOPSIS will be applied, which is a variant of MCDA that has been used frequently in energy planning and analysis (see e.g., [64][65][66]) (in order to provide insights on the robustness of the MCDA results with regard to the chosen MCDA tool, Appendix C offers a system performance analysis using the Preference Ranking Organization Method for Enrichment Evaluation (PROMETHEE) method). MCDA offers a systematic approach to complex decision problems involving multiple perspectives, uncertainty, and competing goals [67].…”
Section: System Performance and Evaluation Of Modeling Resultsmentioning
confidence: 99%
“…Branch and bound is an algorithm design paradigm for discrete and combinatorial optimization problems, as well as mathematical optimization [27][28][29]. The branch and bound algorithm has been applied in many studies because its application is simple.…”
Section: Fr-ess Optimal Parameters Estimating Algorithm Using the Bramentioning
confidence: 99%
“…Xiluodu and Xiangjiaba were first-phase projects, for which impoundment began in 2013 and 2012, respectively. The installed capacities of these two hydropower stations are 12,600 MW and 6000 MW, respectively [34,35]. The hydraulic connection between the two reservoirs is tight, forming a cascade reservoir system with effective joint operation conditions, the main parameters of these two reservoirs are listed in Table 1.…”
Section: Introductionmentioning