2020
DOI: 10.1016/j.epsr.2019.106174
|View full text |Cite
|
Sign up to set email alerts
|

Optimal selection and positioning of conductors in multi-circuit overhead transmission lines using evolutionary computing

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

0
12
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 18 publications
(12 citation statements)
references
References 12 publications
0
12
0
Order By: Relevance
“…Due to the constraints related to safety distances, audible noise levels and the electromagnetic environment, significant challenges are associated with economically developed and densely populated urban areas. The land cost associated with the development of new transmission lines can significantly affect the economic viability of these projects [11]- [13]. Another potential solution is the use of underground cables.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Due to the constraints related to safety distances, audible noise levels and the electromagnetic environment, significant challenges are associated with economically developed and densely populated urban areas. The land cost associated with the development of new transmission lines can significantly affect the economic viability of these projects [11]- [13]. Another potential solution is the use of underground cables.…”
Section: Introductionmentioning
confidence: 99%
“…Doublecircuit and quadruple-circuit overhead transmission lines on same tower are already widely used in many countries. These multi-circuit overhead transmission lines can be of the same voltage levels, but also towers with multiple voltage levels can be encountered [11], [15], [16]. Specific challenges are related to high voltage substations at the entrances of which there are often several parallel overhead transmission lines.…”
Section: Introductionmentioning
confidence: 99%
“…When designing new transmission lines, it is necessary to take into account numerous constraints, such as capacity limits, safety distances, maximum allowable electric and magnetic fields, noise levels, etc. [1]- [4]. Furthermore, it is important to verify that these aforementioned constraints are also satisfied by the overhead transmission lines that are already in operation.…”
Section: Introductionmentioning
confidence: 99%
“…These developments have gradually increased the overall demand for electricity in various industries [1]. Frequent blackouts in the peak period increase the transmission capacity of transmission lines [2,3]. Nowadays, multiple methods to improve the transmission capacity of overhead transmission lines have the characteristics of large investments and long construction periods.…”
Section: Introductionmentioning
confidence: 99%