“…CBs and/or DGs can improve EDS performance through DG allocation work in terms of loss reduction , voltage profile improvement , VDI reduction [12,19,20,21], voltage stability enhancement [2,8,12,14,17,18,20,21,24], GHG emission reduction [8,14,23,24], net savings maximisation [14,15,17,18], and reliability improvement [22,23]. In addition, major objective functions handled in the CBs allocation problem include the cost of real power distribution loss [1][2][3][4][5][6][7][8][9][10], operational cost [2][3][4][5][6][7][8][9][10], and installation cost [1,2,5,7]. Some works use real power loss sensitivity factors (RLSFs) [1,9,…”