2007
DOI: 10.1016/j.enconman.2007.04.016
|View full text |Cite
|
Sign up to set email alerts
|

Optimal sizing of a run-of-river small hydropower plant

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

1
77
0
5

Year Published

2011
2011
2022
2022

Publication Types

Select...
6
2
1

Relationship

0
9

Authors

Journals

citations
Cited by 127 publications
(83 citation statements)
references
References 8 publications
1
77
0
5
Order By: Relevance
“…If we assume the optimal value of the relative tangent velocity to maintain the value computed in Equation (9), we can compute either the diameter D 1 or the α angle by substituting Equation (9) in Equation (7). Assuming that 1 …”
Section: First Step: Design Of Basic Parametersmentioning
confidence: 99%
See 1 more Smart Citation
“…If we assume the optimal value of the relative tangent velocity to maintain the value computed in Equation (9), we can compute either the diameter D 1 or the α angle by substituting Equation (9) in Equation (7). Assuming that 1 …”
Section: First Step: Design Of Basic Parametersmentioning
confidence: 99%
“…The use of RES includes small hydroelectric power (less than 1-3 MW) located along small rivers [1,2] or along water transmission and distribution pipeline systems [3,4] and characterized by continual changes occurring in the turbine operating conditions (discharge and/or load).…”
Section: Introductionmentioning
confidence: 99%
“…For run-of-river analysis, the classical flowduration curve approach seems to be the main method in use (McMahon & Adeyole, 2005) although many methods are available for run-of-river hydropower schemes (Cesari et al, 2004;Paravan et al, 2004;Anagnostopoulos & Papantonis, 2007;Garrido et al, 2009). A single flow-duration curve for the complete time series provides an idea of the long-term performance, but fails to provide a measure of reliability based on inter-annual variability.…”
Section: Introductionmentioning
confidence: 99%
“…However, the study was limited only to turbine configurations without a guide valve and mainly on parameters embedded in the rotor design. Anagnostopoulos and Papantonis [13], on the other hand, conducted size optimization of small hydropower plants using a then newly-developed evaluation algorithm. However, their focus was on the overall plant performance using basic plant size parameters to optimize project cost.…”
Section: Introductionmentioning
confidence: 99%