2023
DOI: 10.1109/access.2023.3237692
|View full text |Cite
|
Sign up to set email alerts
|

Optimal VPP Operation Considering Network Constraint Uncertainty of DSO

Abstract: Operating virtual power plants (VPP) solely based on economic feasibility can cause stability problems, such as voltage violation and power congestion in the distribution system. A cooperation-based operation between the VPP and distribution system operator (DSO) is regarded one of the methodologies for solving stability problems. In the cooperation-based operation method, a VPP establishes an operation strategy considering the information provided beforehand by the DSO, such as the distribution system constra… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2023
2023
2025
2025

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 11 publications
(2 citation statements)
references
References 30 publications
0
2
0
Order By: Relevance
“…In the most recent work, the DSO calculates and communicates the expected distribution system constraints according to the VPP's bidding plan, and the VPP also estimates its own distribution system constraints based on multiple scenario forecasts, and utilizes them in actual operations. In this paper, the process of the DSO communicating distribution system constraints to the VPP occurs only once and does not include an iteration process [9].…”
Section: Introductionmentioning
confidence: 99%
“…In the most recent work, the DSO calculates and communicates the expected distribution system constraints according to the VPP's bidding plan, and the VPP also estimates its own distribution system constraints based on multiple scenario forecasts, and utilizes them in actual operations. In this paper, the process of the DSO communicating distribution system constraints to the VPP occurs only once and does not include an iteration process [9].…”
Section: Introductionmentioning
confidence: 99%
“…In the most recent work, the DSO calculates and communicates the expected distribution system constraints according to the VPP's bidding plan, and the VPP also estimates its own distribution system constraints based on multiple scenario forecasts and utilizes them in actual operations. In this paper, the process of the DSO communicating distribution system constraints to the VPP occurs only once and does not include an iteration process [11].…”
Section: Introductionmentioning
confidence: 99%