2019
DOI: 10.1088/1755-1315/242/6/062044
|View full text |Cite
|
Sign up to set email alerts
|

Optimization Model Calculation of Construction Cost and Time Based on Genetic Algorithm

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 7 publications
0
1
0
Order By: Relevance
“…Hence, they are utilized as a search and planning tool for project scheduling problems that are NP-hard problems [19,41]. GAs can provide good enough and fast enough solutions without mathematical rigor, and because of that, GAs have been widely utilized for construction project optimization [55][56][57]. Haque and Hasin [58] used a GA as a searching tool to solve the time-cost optimization problem of projects under uncertain conditions and fuzzy time periods.…”
Section: Evolutionary Algorithmsmentioning
confidence: 99%
“…Hence, they are utilized as a search and planning tool for project scheduling problems that are NP-hard problems [19,41]. GAs can provide good enough and fast enough solutions without mathematical rigor, and because of that, GAs have been widely utilized for construction project optimization [55][56][57]. Haque and Hasin [58] used a GA as a searching tool to solve the time-cost optimization problem of projects under uncertain conditions and fuzzy time periods.…”
Section: Evolutionary Algorithmsmentioning
confidence: 99%