2024
DOI: 10.3390/min14121183
|View full text |Cite
|
Sign up to set email alerts
|

Optimization Model for Mine Backfill Scheduling Under Multi-Resource Constraints

Yuhang Liu,
Guoqing Li,
Jie Hou
et al.

Abstract: Addressing the resource constraints, such as manpower and equipment, faced by mine backfilling operations, this study proposed an optimization model for backfill scheduling based on the Resource-Constrained Project Scheduling Problem (RCPSP). The model considered backfilling’s multi-process, multi-task, and multi-resource characteristics, aiming to minimize total delay time. Constraints included operational limits, resource requirements, and availability. The goal was to determine optimal resource configuratio… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 34 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?