Optimization Model for the Short-Term Operation of Hydropower Plants Transmitting Power to Multiple Power Grids via HVDC Transmission Lines

Abstract: Long-distance and large-capacity hydropower transmission from large hydropower plants in southwestern China to load centers is an important and effective measure for the accommodation of largescale hydropower in China. However, the load demands of the receiving-end power grids are not fully considered in the conventional power transmission mode, which has greatly affected their enthusiasm for the absorption of trans-regional hydro energy. In order to make full use of the peak shaving capability of the hydropow… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
7
0

Year Published

2020
2020
2025
2025

Publication Types

Select...
8

Relationship

2
6

Authors

Journals

citations
Cited by 26 publications
(7 citation statements)
references
References 46 publications
0
7
0
Order By: Relevance
“…Moreover, HVDC systems are environmentally superior and have lower investment cost for bulk and long-distance power transmission compared to HVAC, enhance power system controllability and reduce carbon emissions and power loss [12]. Thus, China has built extensive HVDC and ultra-high-voltage direct current (UHVDC) transmission projects to facilitate bulk power transfers [13], [14]. Currently, China has commissioned fourteen UHVDC transmission projects, include thirteen ±800kV lines, and the left one is the world's highest voltage level, longest distance and largest capacity Changji -Guquan transmission project, with voltage of ±1100 kV over 3324 km with a capacity of 12 GW.…”
Section: Sf Timentioning
confidence: 99%
“…Moreover, HVDC systems are environmentally superior and have lower investment cost for bulk and long-distance power transmission compared to HVAC, enhance power system controllability and reduce carbon emissions and power loss [12]. Thus, China has built extensive HVDC and ultra-high-voltage direct current (UHVDC) transmission projects to facilitate bulk power transfers [13], [14]. Currently, China has commissioned fourteen UHVDC transmission projects, include thirteen ±800kV lines, and the left one is the world's highest voltage level, longest distance and largest capacity Changji -Guquan transmission project, with voltage of ±1100 kV over 3324 km with a capacity of 12 GW.…”
Section: Sf Timentioning
confidence: 99%
“…In Section 2.1, a simple NLP model, which has a general nonlinear programming structure, was used to solve the approximate problem. With Equation ( 12) as the objective and Equations ( 7)-( 9) and ( 13)-( 15) as constraints, the complex short-term simulation model in Section 2.2 was reformulated as an MILP model that could be easily solved by efficient solvers such as LINGO and CPLEX [12,32,33]. The mathematical model in Section 2.3 was converted into its discretized deterministic equivalents based on the considered inflow scenarios [34].…”
Section: Solutionsmentioning
confidence: 99%
“…The algorithm of the MILP model was developed using a branch and bound (B-and-B) solver (LINGO 18.0, http://www.lindo.com) that showed good stability and global convergence [12,35]. The nonlinear global search method based on the B-and-B algorithm was detailed in the literature of Gau et al [36].…”
Section: Solutionsmentioning
confidence: 99%
See 1 more Smart Citation
“…Although dependent on simplifications in PF modeling, practical works have considered commercial solver-based solution strategies that approximate transmission grid operational features. In [17], for example, the HUC of a plant with 18 GUs is studied, where a high voltage direct current (HDVC) system is considered. The HUC is formulated as a mixed-integer linear programming (MILP) problem, and the transmission load targets of HVDC lines are achieved via specific constraints.…”
Section: Introductionmentioning
confidence: 99%