2017
DOI: 10.24018/ejece.2017.1.2.7
|View full text |Cite
|
Sign up to set email alerts
|

Optimization of a Grid Connected Photovoltaic System using Fuzzy Logic Control

Abstract: He has comparable experience and professional certifications in Health, Safety and Environment; has practiced project management including initial planning and scoping, scheduling, sourcing and procurement of materials and testing of integrated utility management systems, and is equipped with a mindset that facilitates the formulation and implementation of strategies that have significantly improved preventative maintenance and cost efficiency.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
4
0

Year Published

2021
2021
2022
2022

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(4 citation statements)
references
References 15 publications
(41 reference statements)
0
4
0
Order By: Relevance
“…where For the optimization of DERs, the single cell-based optimization is modeled for the PEMFC and PV systems. As MPPT tracking is to optimize the power output in PV, the ideal MPPT point is achieved for specific Vmpp by considering the optimal value of Rs and Rsh to get optimal Ipv by Equation ( 9) [29]. The relation between Rs and Rsh for the optimal MPPT point is given as Equation ( 12).…”
Section: Mathematical Modeling and Implementation Of Proposed Erm Systemmentioning
confidence: 99%
“…where For the optimization of DERs, the single cell-based optimization is modeled for the PEMFC and PV systems. As MPPT tracking is to optimize the power output in PV, the ideal MPPT point is achieved for specific Vmpp by considering the optimal value of Rs and Rsh to get optimal Ipv by Equation ( 9) [29]. The relation between Rs and Rsh for the optimal MPPT point is given as Equation ( 12).…”
Section: Mathematical Modeling and Implementation Of Proposed Erm Systemmentioning
confidence: 99%
“…In addition, communal PV mini-grid requires more complex equipment and costs higher than communal PV mini-grid. The main components of an off-grid system are solar panels, charge controllers, inverters, and batteries [4], [5]. The inverter used in the off-grid system is different from the on-grid system.…”
Section: Introductionmentioning
confidence: 99%
“…The application of the PLTS hybrid system or working principle can run with the PLN electricity system and is regulated in the Minister of Energy and Mineral Resources Regulation of New, Renewable Energy, and Energy Conservation (EBTKE). In this system [5] [6] [9], the PLN electricity network acts as a distributor or liaison for electric current originating from solar panels that are fed to the Therefore, during the day, electricity can utilize electrical energy from sunlight. However, at night, because there is no sunlight, so there is no electricity production from solar panels, you can still use electricity from PLN [10] [12] [13].…”
Section: Introductionmentioning
confidence: 99%
“…In work [23], a photovoltaic system connected through a single-phase inverter to an AC grid, controlled through a fuzzy logic controller, was presented. A comparison between the fuzzy logic controller (FLC) and the conventional PI controller used for interfacing a photovoltaic system, with a grid through a three-phase inverter, was presented in [24,25]. In this work, a comparative study of a photovoltaic system connected to a three-phase grid by means of a three-phase inverter controlled by a fuzzy logic controller, or by a proportional-integral (PI) controller, is presented.…”
Section: Introductionmentioning
confidence: 99%