All Days 2006
DOI: 10.2118/100146-ms
|View full text |Cite
|
Sign up to set email alerts
|

Optimization of Coiled-Tubing Acidizing Through Real-Time Staged Fluid Tracking

Abstract: TX 75083-3836, U.S.A., fax 01-972-952-9435. AbstractIn coiled tubing acidizing, a variety of fluids are pumped through coiled tubing in certain sequence to create the optimized downhole condition to treat the wellbore. Typically, prior to the coiled tubing reaching the target treatment zone, a neutral fluid may be pumped into coiled tubing during running-in-hole (RIH) for circulating purpose. Once at the targeted treatment zone, a pumping schedule (such as pre-flush, treating and postflush fluids) may be used … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 7 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?