2015
DOI: 10.1016/j.renene.2015.03.011
|View full text |Cite
|
Sign up to set email alerts
|

Optimization of electricity generation of a tidal power plant with reservoir constraints

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
8
0
4

Year Published

2019
2019
2022
2022

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 31 publications
(12 citation statements)
references
References 12 publications
0
8
0
4
Order By: Relevance
“…4. The capacity and probability of different states of the model can be calculated by the equation below: (see (9)) . However, the failure of each gate may not result in the reduction of 1/n generated power, and it can be determined with the simulation of the plants.…”
Section: Reliability Model Associated With Components Failurementioning
confidence: 99%
See 3 more Smart Citations
“…4. The capacity and probability of different states of the model can be calculated by the equation below: (see (9)) . However, the failure of each gate may not result in the reduction of 1/n generated power, and it can be determined with the simulation of the plants.…”
Section: Reliability Model Associated With Components Failurementioning
confidence: 99%
“…Each harmonic component represents a physical phenomenon associated with the tides. The tide variation can be represented by a series as given by the equation below [9]:…”
Section: Effects Of the Uncertain Nature Of The Tidal Height On Genermentioning
confidence: 99%
See 2 more Smart Citations
“…In Ref., 4 a tidal unit is considered to be installed in Brazil and based on the existing conditions and associated restrictions, the generated power is calculated. In Ref., 5 based on the PSO algorithm, an optimization problem is solved and the number of turbines for maximization generated energy of tidal units equipped to the barrage is determined. In Ref., 6 the effect of operational parameters such as hydro pump on the generated power of a tidal unit with the barrage installed in the Mersey estuary is investigated.…”
Section: Introductionmentioning
confidence: 99%