Wind Power 2010
DOI: 10.5772/8362
|View full text |Cite
|
Sign up to set email alerts
|

Optimization of Spinning Reserve in Stand-alone Wind-Diesel Power Systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2012
2012
2021
2021

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 22 publications
0
1
0
Order By: Relevance
“…For 1.1 MW diesel-based CHP generators and 2.0 MW wind generation units, total start-up and synchronization times range a few milliseconds [33], [34]. These times were also neglected in the load transferring evaluations.…”
Section: A System Characteristicsmentioning
confidence: 99%
“…For 1.1 MW diesel-based CHP generators and 2.0 MW wind generation units, total start-up and synchronization times range a few milliseconds [33], [34]. These times were also neglected in the load transferring evaluations.…”
Section: A System Characteristicsmentioning
confidence: 99%