2022
DOI: 10.1007/s42461-022-00606-z
|View full text |Cite
|
Sign up to set email alerts
|

Optimization Production Scheduling of Underground Backfilling Mining Based on NSGA-II

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2025
2025

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 31 publications
0
1
0
Order By: Relevance
“…The scheduling of underground mining activities is influenced by a range of factors, including the availability of equipment, geological conditions, and safety considerations. The efficient scheduling of mining requires the use of advanced optimization techniques to develop optimal schedules that minimize operational costs while maximizing productivity [2,3].…”
Section: Introductionmentioning
confidence: 99%
“…The scheduling of underground mining activities is influenced by a range of factors, including the availability of equipment, geological conditions, and safety considerations. The efficient scheduling of mining requires the use of advanced optimization techniques to develop optimal schedules that minimize operational costs while maximizing productivity [2,3].…”
Section: Introductionmentioning
confidence: 99%