Day 1 Mon, November 12, 2018 2018
DOI: 10.2118/193252-ms
|View full text |Cite
|
Sign up to set email alerts
|

Optimized Isochronal Flow Tests

Abstract: An Optimized Isochronal Test (OIT) is presented to evaluate the deliverability of a reservoir eliminating the need of shut-in periods during a multirate well test, which represents an operational constraint for classical isochronal tests and in some instances for modified isochronal tests. The proposed technique is based on the effect of several consecutive and different production rates over the well-reservoir model during both transient flow and pseudo-steady state flow; thus, it is possible t… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 3 publications
0
1
0
Order By: Relevance
“…Furthermore, an alternative approach known as the Optimized Isochronal Test (OIT) method can be employed in addition to the above two ways. In this approach, the inclusion of a well closure interval is unnecessary due to the pressure being determined based on the research radius [17]. By employing this approach, well testing can be conducted at a reduced expense while yielding comparable outcomes to alternative methods.…”
Section: Introductionmentioning
confidence: 99%
“…Furthermore, an alternative approach known as the Optimized Isochronal Test (OIT) method can be employed in addition to the above two ways. In this approach, the inclusion of a well closure interval is unnecessary due to the pressure being determined based on the research radius [17]. By employing this approach, well testing can be conducted at a reduced expense while yielding comparable outcomes to alternative methods.…”
Section: Introductionmentioning
confidence: 99%