All Days 2004
DOI: 10.2118/89636-ms
|View full text |Cite
|
Sign up to set email alerts
|

Optimizing Integrated Rigless Plug and Abandonment – A 60 Well Case Study

Abstract: This paper presents the Petroleum Development of Oman (PDO) Rigless plug and abandonment (P&A) methodology, technologies & practices which resulted from the corporate goal to find a cost effective means to P&A obsolete oil wells. As the main Omani Oil Exploration & Development company, PDO is abandoning aging wells and fields and they must balance environmental and financial objectives. Technically sound abandonment practices are essential for long-term environmental protection. Many operators … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
1
0
1

Year Published

2008
2008
2023
2023

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 9 publications
(2 citation statements)
references
References 5 publications
0
1
0
1
Order By: Relevance
“…The shear bond strength to pipe is improved by use of expandable cement or bonding agents such as latex and surfactants. Expanding properties of expandable cements prevent the development of microannuli at the interface between casing and formation and cement plug, and subsequently, ensure good bonding with casing [19]. The inclusion of latex additives to cement slurry lowers the surface tension between the slurry and casing and helps cement adhere to casing while setting.…”
Section: Shear Bond Strength =mentioning
confidence: 99%
“…The shear bond strength to pipe is improved by use of expandable cement or bonding agents such as latex and surfactants. Expanding properties of expandable cements prevent the development of microannuli at the interface between casing and formation and cement plug, and subsequently, ensure good bonding with casing [19]. The inclusion of latex additives to cement slurry lowers the surface tension between the slurry and casing and helps cement adhere to casing while setting.…”
Section: Shear Bond Strength =mentioning
confidence: 99%
“…Existem em torno de 600.000 poços produtores ao redor mundo e, em algum momento, todos eles necessitarão de uma operação de tamponamento (39). Além disso, o aumento da consciência acerca da preservação do meio ambiente acarreta na exigência de melhoria dos procedimentos de tamponamento e abandono de poços (P&A -Plugging and Abandonment) para garantir um descomissionamento apropriado (170). Essa preocupação au-mentou significativamente em 2010 após o acidente que ocorreu em Macondo, no Golfo do México (EUA) (137).…”
Section: Figura 12: Posicionamento De Tampão Balanceadounclassified