2013 5th International Conference on Modeling, Simulation and Applied Optimization (ICMSAO) 2013
DOI: 10.1109/icmsao.2013.6552571
|View full text |Cite
|
Sign up to set email alerts
|

Optimizing the performance of complex maintenance systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2015
2015
2022
2022

Publication Types

Select...
4

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 9 publications
0
2
0
Order By: Relevance
“…Alalawin et al [20] use integer programming with a nonlinear probabilistic constraint to solve spare parts stock and the LORA problem simultaneously. Their approach is very similar of Triki et al [19] except for the multi-echelon environment and some extensions. As we noted earlier, there is no study that considers variables such as repair times, system usage schedule, availability of maintenance personnel, and replenishment time of parts simultaneously in multi-echelon, multi-indenture, and a multi-objective environment that can be used in PBL.…”
Section: A Brief Literature Review On Pbl and Joint Optimisation Of S...mentioning
confidence: 98%
See 1 more Smart Citation
“…Alalawin et al [20] use integer programming with a nonlinear probabilistic constraint to solve spare parts stock and the LORA problem simultaneously. Their approach is very similar of Triki et al [19] except for the multi-echelon environment and some extensions. As we noted earlier, there is no study that considers variables such as repair times, system usage schedule, availability of maintenance personnel, and replenishment time of parts simultaneously in multi-echelon, multi-indenture, and a multi-objective environment that can be used in PBL.…”
Section: A Brief Literature Review On Pbl and Joint Optimisation Of S...mentioning
confidence: 98%
“…Triki et al [19] solve single-echelon, multi-indenture problem using optimisation via simulation outputs. Alalawin et al [20] use integer programming with a nonlinear probabilistic constraint to solve spare parts stock and the LORA problem simultaneously.…”
Section: A Brief Literature Review On Pbl and Joint Optimisation Of S...mentioning
confidence: 99%