2019
DOI: 10.1007/978-3-030-32579-4_15
|View full text |Cite
|
Sign up to set email alerts
|

Outlier Detection in Predictive Analytics for Energy Equipment

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
1
0
1

Year Published

2021
2021
2024
2024

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 8 publications
(2 citation statements)
references
References 13 publications
0
1
0
1
Order By: Relevance
“…The proposed hardware and software complex is classed as embedded solutions, the development and debugging of which imposes a number of requirements. The most relevant issues are the application of basic universal structures, ensuring the flexibility and reconfigurability of the control system used, and the possibility of operational maintenance and predictive repair (Yudin et al, 2017;Khan et al, 2021;Andryushin et al, 2020). The hardware and software complex is built according to the agent-manager scheme; agent applications collect heterogeneous data from the sensor network elements and transfer them to management modules.…”
Section: Resultsmentioning
confidence: 99%
“…The proposed hardware and software complex is classed as embedded solutions, the development and debugging of which imposes a number of requirements. The most relevant issues are the application of basic universal structures, ensuring the flexibility and reconfigurability of the control system used, and the possibility of operational maintenance and predictive repair (Yudin et al, 2017;Khan et al, 2021;Andryushin et al, 2020). The hardware and software complex is built according to the agent-manager scheme; agent applications collect heterogeneous data from the sensor network elements and transfer them to management modules.…”
Section: Resultsmentioning
confidence: 99%
“…-прогноз ресурса узлов и деталей. Системы предиктивной аналитики и мониторинга в своем развитии способствуют качественному переходу от системы планово-предупредительных ремонтов по регламентам к системе ремонтов по фактическому техническому состоянию, то есть от нормативных, формальных сроков ремонта -к рискориентированным, реально профилактическим, когда алгоритмы системы будут в постоянном режиме оценивать реальное состояние деталей, узлов, агрегатов в целом [7].…”
Section: безопасность труда и охрана здоровьяunclassified