IEEE PES General Meeting 2010
DOI: 10.1109/pes.2010.5589481
|View full text |Cite
|
Sign up to set email alerts
|

Outstanding questions around increasing variable generation penetration in the ERCOT system

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
5
0

Year Published

2011
2011
2014
2014

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 9 publications
(5 citation statements)
references
References 0 publications
0
5
0
Order By: Relevance
“…The reference value of each wind farm equals to its predicated maximum generation capacity when its needn't to curtail wind power, the process is as (9) shows . ,max ,max ( 1) (…”
Section: B Operating Point Of Wind Farm Output Acctive Power Considementioning
confidence: 99%
See 1 more Smart Citation
“…The reference value of each wind farm equals to its predicated maximum generation capacity when its needn't to curtail wind power, the process is as (9) shows . ,max ,max ( 1) (…”
Section: B Operating Point Of Wind Farm Output Acctive Power Considementioning
confidence: 99%
“…Along with large amount of wind power integrated, the power system will face the intermittent and uncertainty of wind power besides the fluctuation of load, it's an important issues to ensure the reliability and efficiency of power system [1]- [3]. The predication error of wind power ahead by an hour could be up to 10%-15% of rated power, which is much larger than the predication error of load power.…”
Section: Introductionmentioning
confidence: 99%
“…To account for this error while managing frequency and to reduce the inaccurate balancing deployment caused by WGRs, ERCOT added WGR QSE's SCE to the balancing energy requirement. ERCOT also implemented the wind forecasting tool to provide hourly wind forecast for both the individual wind farms and on the aggregate system level and continue to improve the accuracy of forecasting [8,9,10,11].…”
Section: Effect On Management Of Frequencymentioning
confidence: 99%
“…ERCOT operators are forced to use more expensive ancillary reserves more frequently in order to maintain frequency at the desired level. To address this issue, ERCOT is improving wind generation forecast tool for real time operation while making changes to ancillary service requirement determination methodology to take into consideration the effects of wind generation [8,9,10,11,12].…”
Section: Introductionmentioning
confidence: 99%
“…Along with large amount of wind power integrated, the power system will face the intermittent and uncertainty of wind power besides the fluctuation of load, it's an important issues to ensure the reliability and efficiency of power system [1]- [3]. The prediction error of wind power ahead by an hour could be up to 10%-15% of rated power, which is much larger than the prediction error of load power.…”
Section: Introductionmentioning
confidence: 99%