All Days 2014
DOI: 10.2118/172482-ms
|View full text |Cite
|
Sign up to set email alerts
|

Paper Title: Well Rejuvenation through ‘Novel Thru-Tubing Sand Screen Insert’ in a Horizontal Completion with Sand Production Challenges

Abstract: Well A (offshore field) was drilled in June 2002 to provide horizontal drainage point on the reservoir. It was completed as a Single String Single (SSS) Producer with 3 ½" tubing string. The sand face was completed with 5 ½" slotted liner (SL) with screen size of 300μm for sand control across 1, 505ft horizontal drain hole since the reservoir is unconsolidated. The interval started production in May 2003 and was closed-in for about a year for pipeline changeout due to pressure integrity before it was shut-in f… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
references
References 0 publications
0
0
0
Order By: Relevance