2022
DOI: 10.3934/jimo.2020174
|View full text |Cite
|
Sign up to set email alerts
|

Parallel-machine scheduling in shared manufacturing

Abstract: <p style='text-indent:20px;'>We consider parallel-machine scheduling in the context of shared manufacturing where each job has a machine set to which it can be assigned for processing. Such a set is called the processing set. In the shared manufacturing setting, a job can be assigned not only to certain machines for processing, but can also be processed on the remaining machines at a certain cost. Compared with traditional scheduling with job rejection, the scheduling model under study embraces the notio… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
7
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 11 publications
(7 citation statements)
references
References 44 publications
0
7
0
Order By: Relevance
“…Wei et al consider two-machine hybrid flow-shop scheduling problems in shared manufacturing [18]. Ji et al consider parallel-machine scheduling problems in shared manufacturing [19].…”
Section: Shared Manufacturingmentioning
confidence: 99%
“…Wei et al consider two-machine hybrid flow-shop scheduling problems in shared manufacturing [18]. Ji et al consider parallel-machine scheduling problems in shared manufacturing [19].…”
Section: Shared Manufacturingmentioning
confidence: 99%
“…Zhang et al [10] proposed a monitoring and maintenance method for idle resources in shared manufacturing using sensor perception and proved its effectiveness. Ji et al [11] established a resource scheduling model that includes sustainable manufacturing in a shared manufacturing environment. Wei and Wu [12] studied the problem of two two-machine hybrid assembly workshops with fixed processing sequences to solve the scheduling problem of a series of selected processing sequences on a shared manufacturing platform.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Industrial manufacturing Sustainable manufacturing Bank (Hwang et al, 2004) Credit card (Hwang et al, 2004) Online antivirus (Tseng et al, 2017) Flour mill (Glass and Kellerer, 2007) Loading/unloading cranes (Ou et al, 2008) Painting processing (Mateo et al, 2018) Sugarcane unloading systems (Kusoncum et al, 2021) Tempered glass processing (Liu et al, 2020) Shared manufacturing (Ji et al, 2022) The research on GoS constraints started with the scheduling problem in the service industry. The service industry provides different services according to customer membership levels (Hwang et al, 2004).…”
Section: Table 1 the Practical Cases Of Gos Constraints Service Industrymentioning
confidence: 99%
“…The GoS constraint is used to meet the environment-oriented objective. Ji et al (2022) investigated the problem of shared manufacturing schedules with the concept of sustainable manufacturing. Each job can be processed in a set of machine sets, and such a new constraint is called a processing set.…”
Section: Table 1 the Practical Cases Of Gos Constraints Service Industrymentioning
confidence: 99%