2009
DOI: 10.1007/978-1-84882-310-5_5
|View full text |Cite
|
Sign up to set email alerts
|

Parallel Tasks

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2016
2016
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(4 citation statements)
references
References 184 publications
0
4
0
Order By: Relevance
“…Linear-Speedup Model. An ideal speedup model is linear when p does not exceed a threshold δ j (Drozdowski, 2004): t j,p = t j,1 p where η j,p = p; the workload of T j is independent of p since D j,p = pt j,p = t j,1 . Benoit et al (2022a) propose a 2-approximation algorithm, called LPA-LIST, for failure-prone platforms with additional constraints in the process of executing jobs.…”
Section: Typical Speedup Models and Motivationmentioning
confidence: 99%
See 2 more Smart Citations
“…Linear-Speedup Model. An ideal speedup model is linear when p does not exceed a threshold δ j (Drozdowski, 2004): t j,p = t j,1 p where η j,p = p; the workload of T j is independent of p since D j,p = pt j,p = t j,1 . Benoit et al (2022a) propose a 2-approximation algorithm, called LPA-LIST, for failure-prone platforms with additional constraints in the process of executing jobs.…”
Section: Typical Speedup Models and Motivationmentioning
confidence: 99%
“…The problem of scheduling moldable tasks to minimize the makespan is strongly NP-hard when m ≥ 5 (Drozdowski, 2004). There is a long history of study with continuous improvements to the approximation ratio or time complexity.…”
Section: Makespan Minimizationmentioning
confidence: 99%
See 1 more Smart Citation
“…Alternatively, in simulations where the domain crossing events are deterministic and thus predictable, conservative simulation may be used as it is possible to avoid causal violations altogether (Fujimoto, 1990; Heidelberger and Nicol, 1993). In particular, a parallel scheduler (Drozdowski, 2009) can be used to create an execution order which guarantees causality, as has been previously shown by Nicol and Liu (2002) and Xiao et al (1999), notably with the focus on simulation of telecommunication networks.…”
Section: Introductionmentioning
confidence: 99%