Part-grouping and build-scheduling with sequence-dependent setup time to minimize the makespan for non-identical parallel additive manufacturing machines

Abstract: This paper addresses a part-grouping and build-scheduling problem for an additive manufacturing process with non-identical parallel additive manufacturing machines. Parts with the same material can be simultaneously manufactured as a build in the machine. The total areas of parts in the build cannot exceed the area capacity of the machine. Each machine has different heights in a build area. The maximum height of parts in the build is less than or equal to the height of each machine in the build area. The proce… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5
1
1

Relationship

0
7

Authors

Journals

citations
Cited by 15 publications
(2 citation statements)
references
References 28 publications
0
2
0
Order By: Relevance
“…Alicastro et al proposed a reinforcement learning iterated local search meta-heuristic, based on the implementation of a Q-learning variable neighborhood search, to provide heuristically good solutions at the cost of low computational expenses [23]. Kim and Kim addressed a part-grouping and build-scheduling problem for an additive manufacturing process with non-identical parallel additive manufacturing machines [24].…”
Section: Literature Reviewmentioning
confidence: 99%
“…Alicastro et al proposed a reinforcement learning iterated local search meta-heuristic, based on the implementation of a Q-learning variable neighborhood search, to provide heuristically good solutions at the cost of low computational expenses [23]. Kim and Kim addressed a part-grouping and build-scheduling problem for an additive manufacturing process with non-identical parallel additive manufacturing machines [24].…”
Section: Literature Reviewmentioning
confidence: 99%
“…Li et al [8] then studied the problem of minimizing job completion time on a single batch processing machine with 2D packing constraints, representing the machine platform as a 2D rectangle, where each job occupies the size of a rectangle. Kim et al [9] and Toksarı et al [10] considered multi-material part production, aiming to directly minimize the maximum completion time of multi-material part production plans and indirectly minimize material changeovers. Chergui et al [11] and Rohaninejad et al [12] further considered customer order due date problems.…”
Section: Introductionmentioning
confidence: 99%