2012
DOI: 10.1016/j.applthermaleng.2011.11.068
|View full text |Cite
|
Sign up to set email alerts
|

Part-load analysis of gas turbine & ORC combined cycles

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
20
0
2

Year Published

2013
2013
2025
2025

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 59 publications
(22 citation statements)
references
References 17 publications
0
20
0
2
Order By: Relevance
“…The recuperative layout is feasible when organic (dry) fluids are used since they are found in superheated state at the turbine exhaust section. Hence, as a general rule of thumb, it can be considered that ORC recuperative cycles are of interest when the temperature difference between the turbine exhaust and the pump impulse section is above 50 ºC (if not, the added cost of this device is not compensated by the increased efficiency) [10,11]. Table 6 presents the specifications of the reference ORC cycle used for comparison (ΔT rec is the pinch point in the recuperator).…”
Section: Orc Plant Performancementioning
confidence: 99%
See 3 more Smart Citations
“…The recuperative layout is feasible when organic (dry) fluids are used since they are found in superheated state at the turbine exhaust section. Hence, as a general rule of thumb, it can be considered that ORC recuperative cycles are of interest when the temperature difference between the turbine exhaust and the pump impulse section is above 50 ºC (if not, the added cost of this device is not compensated by the increased efficiency) [10,11]. Table 6 presents the specifications of the reference ORC cycle used for comparison (ΔT rec is the pinch point in the recuperator).…”
Section: Orc Plant Performancementioning
confidence: 99%
“…Tables 8 and 9 present the predicted performance of the plant at design conditions and the average performance of the retrofitted plants (both layouts) during year 2007 respectively. [11] by the authors, where an analysis of gas turbine and ORC bottoming systems is presented. In the existing wastewater station, the annual electricity consumption is 15590 MWh, 10400.6 MWh of which are produced by the CHP plant.…”
Section: Heat Recovery Vapour Generatormentioning
confidence: 99%
See 2 more Smart Citations
“…The control system utilized subsequently the optimal operation point at part load. A cascade type of control has been implemented in the combined gas turbine-ORC system by de Escalona et al [104]. The study focused on the benefits from the addition of the ORC for waste heat recovery and considered part load conditions in the ORC performance.…”
Section: Control Approachesmentioning
confidence: 99%